A421 Great Barford Bypass Main Contractor Edmund Nuttall Limited
Installation of over 6.4 kilometres of 4 roped Brifen Wire Rope Safety Barrier in central reserve incorporating Sologuard gates at strategic positions for emergencies and contra flow.
Over 7 kilometres of Open Box Beam installed at bridges and other sites along the bypass to provide Safety Barrier protection where required