Temporary Barriers
HW Martin Safety Fencing Ltd have been, over the last few years, in a working partnership with Asset International, one of the main installers of the VARIOGUARD Temporary Barrier System
The use of ASSET VARIOGUARD® for lane rental projects is tried and tested. As part of the continuous improvement ASSET have developed QUICK-JOINTS. The extensive rental pool is now fully equipped with this new jointing system and our specialist installers can offer installation rates of up to 400m per hour with this system.
HW Martin have previously installed ,relocated and uplifted over 10km of Varioguard on the M25 adjacent to Heathrow Airport and are currently in the process of doing the same with over 19km on the M1 Junctions 6-10. As well as smaller schemes all over the UK.


services and case studies:
CASESTUDIES
Click the below links to go to the case study pages
M1 Junction 6-10 Widening Main Contractor Balfour Beatty
Derbyshire Maintenance 2007 - 2009 Main Contractor Derbyshire County Council
M18 Junction 1 to Long Leys Main Contractor Lafarge May Gurney
